Risk of failure of Hidroituango dam, Colombia

Sentinel-2 MSI acquired on 07 April 2018 at 15:36:19 UTC
Sentinel-2 MSI acquired on 07 May 2018 at 15:36:19 UTC
Sentinel-2 MSI acquired on 12 May 2018 at 15:36:21 UTC
Sentinel-2 MSI acquired on 22 May 2018 at 15:36:21 UTC
Author(s): Sentinel Vision team, VisioTerra, France - svp@visioterra.fr
Keyword(s): Hydrology, river, lake, hydropower, dam, infrastructure, flooding, emergency, renewable energy, Colombia
Fig. 1 - S2 (07.04.2018) - 4,3,2 natural colour - Once completed, the 225m high dam should produce 2400MW for a cost of 3.5 G€ - 2D view
Insufficient water discharge endangers the dam. Cheap design has been pointed out. Before that the public tender had been contested as unfair.
Fig. 2 - 07.05.2018 - In early April sealed the last diversion tunnel collapsed, flooding the upstream valley. - 2D animation 2D view
Fig. 3 - 22.05.2018 - The 12.05.2018, uncontrolled unclogging caused downstream flood & eroded the dam wall's drain layer - 2D animation 2D view
Fig. 4 - 22.05.2018 - Locals of P. Valdidia, where houses & bridges have been destroyed, are among the 25000 evacuees - 2D animation 2D view